

🗓️ Own your projects with the planner that means business.
The Quartet Prestige 2 Magnetic Total Erase Project Planner is a 3x2 feet porcelain dry-erase board featuring a 16-row by 29-column customizable grid. Its magnetic surface allows for dynamic project tracking with magnets, while the durable, stain- and scratch-resistant porcelain finish is backed by a 20-year warranty. Designed for moderate use in busy professional environments, it includes a sleek graphite frame with integrated Prestige 2 Connects™ accessory compatibility and an attachable marker tray, making it the ultimate organizational tool for managers and teams aiming to stay ahead.
| ASIN | B00HDT1VT0 |
| Additional Features | Not_Performance_Used |
| Best Sellers Rank | #151,600 in Office Products ( See Top 100 in Office Products ) #1,431 in Dry Erase Boards |
| Brand | Quartet |
| Brand Name | Quartet |
| Color | Clear |
| Customer Reviews | 4.4 out of 5 stars 161 Reviews |
| EU Spare Part Availability Duration | 20 Years |
| Frame Material | stainless_steel, Metal |
| Included Components | PP32P2 |
| Item Dimensions W x H | 24"W x 36"H |
| Item Weight | 10 Pounds |
| Manufacturer | ACCO Brands |
| Material | Metal |
| Material Type | Metal |
| Mounting Type | Wall Mount |
| Occasion | Birthday |
| Orientation | Horizontal |
| Product Dimensions | 24"W x 36"H |
| Recommended Uses For Product | Moderate |
| Target Audience | Business Professional, Parent, Student, Teacher |
| UPC | 034138201411 |
| Unit Count | 1.0 Count |
| Warranty Description | 20 years |
| Writing Board Type | Whiteboard |
J**E
Quality pre-printed dry erase board.
Since there were no reviews for this board as of the date of this writing I figured I would go ahead and put one up in case it helps someone. I was in need of a dry erase board that had different grids on it when I came across this one. I had looked at several and this one was priced in between buying a blank dry erase board and using grid tape and other more expensive pre-printed boards so I decided to go for it. Item arrived in a tall/slim box, the actual boards box was placed inside of a slightly larger cardboard box for shipping. The board itself seems to be of quality construction and is at least equal to several other dry erase boards I have and it is lightweight for its size. The pre-printed grid lines (both horizontal and vertical) have plenty of room to write in of a size that is legible. Overall I like this board and it fits my needs fine, I plan on keeping it.
J**D
Calendar
I like this as it is low profile and helps me to track and organize my week to week
C**.
Well made.
Very handy. Use for making horse assignments in our riding school. So it’s versatile. Good quality. Wish vertical lines for the time columns were bolder and easier to see and follow down the column.
P**N
AMAZING BOARD
WORKS FOR OUR OFFICE IN BUILDING PERMITS; ADDED THE MAGNETS WITH LABELS - THE TRAY FOR THE MARKERS IS A TRICK TO PUT TOGETHER.
K**2
I'm better ordered already!
This board is very clear with a bright white base and distinctive partitions. The frame is sturdy and easily mounted. There's also a pen/eraser tray, but you don't have to add it. It's essentially optional.
S**B
Awesome board
Awesome, looks fantastic, heavy, solid board (not like heavy 100lbs. But it has a good feel in the weight, not cheap) love the bottom rack, attempted to put together without the instructions (I'm a guy), had to look though.... Have bought many cheap magnetic board in the past, not so cheap dollar wise but material/design wise. This is a first rate board in my opinion.
D**S
Pricey to arrive scratched and scuffed
Was enthusiastic about this board and decided the personal expense was worth the visual project organization. It arrived packaged well and with four dry-erase markers included. However, there are large scratches and scuffs in the whiteboard surface right out of the box and I will never stop noticing them. They don’t buff out with cleaning. I’m disappointed in the quality for the price and would return it if I didn’t feel I need a solution right away. Shop around for better quality/value.
R**S
Best tool for photography tasking!!!!
We use this to track our tasks for booking/delivering our weddings. It's been useful for my team to stay on top of our workflow. I will say the instructions to put it together leave little to be desired, which made it a little challenging to set up. The board is heavy so you need a strong wall. We are ordering more because we love them so much. My wedding planner office mate uses one too. Amazing for workflow
ترست بايلوت
منذ شهرين
منذ شهر